Pre-commissioning WTGs
Pre-Commissioning Services for Wind Turbine Generators
Our meticulous approach to pre-commissioning ensures that your wind turbine generators are ready to deliver peak performance from day one. By minimizing downtime and maximizing energy output, we help you achieve your operational goals efficiently and safely.
Detailed Inspections
Our process starts with comprehensive inspections of all wind turbine components, including mechanical, electrical, and structural elements. We verify the integrity of the turbine's structure, ensure all electrical systems are fault-free, and confirm that each component is correctly installed and aligned according to the manufacturer's specifications.
Functional Testing
We conduct rigorous functional tests to verify that all systems are operating correctly before commissioning. This includes testing the generator, transformer, mechanical systems, and control systems under simulated conditions to ensure they perform as expected during real-world operations.
Precision Calibration
To ensure peak performance, we offer precision calibration services. This involves fine-tuning sensors, control systems, and the blade pitch system, ensuring accurate data collection and optimal energy output while reducing mechanical stress on the turbine.
Electrical Commissioning
Our electrical commissioning services focus on ensuring the turbine’s electrical systems are fully operational and ready for grid integration. We test and certify cables, verify transformer functionality, and conduct grid compliance tests to ensure safe and efficient energy production.
Mechanical and Structural Commissioning
We ensure the turbine’s mechanical and structural components are fully prepared for operation. Through load testing, torque verification, and vibration analysis, we confirm that the turbine can handle operational stresses and maintain structural integrity.
System Integration Testing
We perform comprehensive system integration testing to ensure seamless operation. This includes verifying the SCADA system, testing communication systems, and ensuring redundancy protocols are in place to maintain continuous operation.
Final Quality Assurance
Before handing over the turbine, we conduct a final quality assurance check. This includes a thorough review of all inspections, testing, and calibration results, followed by a detailed client handover and performance verification to ensure the turbine is ready for operational commissioning.